Switching a board between Kanban and Scrum: a new Kerika feature

When we first started working on Kerika, it seemed to us that everyone who wanted to use an online project board fell into one of two camps that didn’t overlap:

  • Kanban users, who wanted a simple Task Board, perhaps with nothing more than To Do, Doing, and Done columns.
  • Scrum users, who wanted to share Backlogs across multiple Scrum Boards, with each Scrum Board representing a different Scrum iteration (i.e. “Sprint”).

Folks who wanted to work in Kanban-style – typically business users – seemed to have little use for Scrum, and people who wanted to work in Agile-style – typically IT folks – didn’t show much interest in Kanban.

So, we built Kerika with support for Task Boards, for Lean/Kanban users, and Scrum Boards, for Agile users.

What we are seeing more recently, however, is spectrum of usage patterns and styles within organizations:

  • A project that starts off as a Kanban Board might need to become a Scrum Board in the future: as the team works on the project, it may conclude that a series of Sprints/iterations is a better model than a continuous flow/Kanban model, and they may need to transform their Kanban Board to a series of Scrum Boards.
  • A team might start off working with Scrum Boards, thinking that Agile is the ideal model for their work, and then find that a Kanban model of continuous flow is better suited for their needs, in which case they may need to change from a Task Board to a Scrum Board.
  • A Scrum team may need to pull items from multiple Backlogs: there may be items from a Marketing Backlog and from a Product Development Backlog that need to get worked on in the same Sprint, so the team may need to switch from one Backlog to another.

This kind of flexibility wasn’t available in Kerika before — and is certainly not available in Trello, Asana, Basecamp or any other tools that compete with Kerika — and that’s exactly the problem that we have fixed with the new release!

Use the Project Info button, on the top-right of the Kerika menu bar, to switch a board from Kanban to Scrum, or vice versa:

Settings
Settings

If you check the “Use a shared Backlog” box, you can then select the Backlog you want to use for your board: if you had been working in a Kanban board, it automatically switches over to a Scrum Board.

At any time you can switch between any of the Backlogs that exist in the Account, that you have permission to access.

If you want to go back to working in Kanban-style, just uncheck the “Use a shared Backlog” box and the Backlog will disappear from view.

It’s now that simple to choose between Kanban and Scrum!

Work-In-Progress Limits: a new Kerika feature!

We are thrilled to announce a great new feature: Work-In-Progress (WIP) Limits for Kanban Boards and Scrum Boards.

WIP Limits are a very helpful tool when you are working in a true Kanban style: where work gets “pulled” as people become free, rather than work getting “pushed” onto people before the people ready.

To understand the difference between “push” vs. “pull”, think back to that famous episode of “I Love Lucy” where Lucy and Ethel take up jobs at a chocolate factory, and quickly find themselves unable to keep up with all the work that’s getting pushed onto them:

This is a perfect example of the perils of “push”: as the chocolate gets prepared upstream, the work becomes ready even though the people aren’t ready for the work.

If you push work on to people who aren’t ready to take it on, you will quickly have disastrous results. (It’s funny only when it’s on TV and it involves Lucy.)

At the very least, you will have an imperfect understanding of what each person is actually doing, if people upstream in the project’s workflow simply push work downstream as soon as the upstream folks are done with it.

A pull model is different: people “pull” work and assign it to themselves when they are ready.

Each person typically has a small number of items they are juggling at any time: it may be as few as two items, depending upon the complexity of the work, but it is rarely as few as just one item.

(You nearly always want to have one “background” task ready to be picked up whenever your “foreground” task gets blocked for any reason.)

When a person is able to take on a new task, she can “pull” a card from the column to  the left of her on a Kerika board.

Here’s a simple example, reflecting the workflow for a software project:

WIP Workflow Example
WIP Workflow Example

This project includes people with different roles: designers, developers and QA, and each group has determined it’s own WIP limits, based upon the team’s capacity and velocity.

In this particular example, we can see that the Planning & Design and Deployment columns have currently exceeded their WIP limits (and, in the case of Deployment, by a large margin!)

When this happens, Kerika alerts you to the condition by showing the affected columns with red text in the column headers:

Example board with WIP exceeded
Example board with WIP exceeded

WIP Limits as “soft limits”: Kerika doesn’t stop you from exceeding a column’s WIP Limit, but it does provide a very clear, visible warning to everyone that a bottleneck is about to form.

When bottlenecks start to form, the Project Leader should intervene and help manage the upstream flow so that the WIP Limit can come back to its acceptable amount.

WIP Limits originated in Kanban, but Kerika lets you use them for Scrum Boards as well!

To use WIP Limits, click on the Project Info button that’s at the top-right of the Task Board or Scrum Board:

Settings
Settings
  • WIP Limits can be set for every column on a board except for the Backlog,  Done, and  Trash.
  • WIP Limits can be turned ON or OFF at any time: turning WIP Limits OFF doesn’t cause the old values to be forgotten.

Pretty cool, huh?

We should probably stop saying “unlimited cards”…

OK, so our website has long stressed the word “unlimited”, and maybe that’s not such a great idea…

Most people have boards with a few dozen cards.

Some folks have boards with a couple of hundred cards.

Very few people have boards with up to 1,000 cards.

It turned out that one of our users had a board with nearly 4,200 cards, of which over 4,000 were in the Trash.

And that’s not good! A board with several thousand cards on it is going to take a long time to load, because each card has many different attributes to it: details, chat, assignments, status, history, etc.

And when someone with a very large board uses Kerika, this can cause very unexpected loads on the servers, particularly in terms of network I/O and CPU utilization.

This is what it looks like when someone suddenly opens a board with thousands of cards on it:

CPU spikes
CPU spikes

We have talked about this before, and now we need to do something about it…

Most of the time, boards get very big because they are very old: stuff piles up in the Done column, or, as in this case, in the Trash column.

Having very large boards can impact performance: unlike, say, email which you may be accustomed to leaving piled up in your Inbox for years on end, Kerika’s cards are “live object”: even when a card is in the Done or Trash columns, it is constantly listening for updates from the server, because it could be moved out of Done or Trash at any time by someone on the team, or have some of it’s attributes changed.

For example, even though a card is “Done” or “Trashed”, it could have its details updated, or new chat added to it.

This is different from email messages, which are essentially “dead objects”: once you get an email and read it, it doesn’t update after that, so it can sit for years in your Inbox without trying to get fresh updates from the mail server.

So, when you have 4,200 cards on a single board, you have that many live objects trying to get updates from the server at the same time, and that’s not good for your browser or our server!

(Imagine your laptop trying to read and display 4,200 emails at the same time, and you will get an idea of the problem…)

Having very large boards is not a good idea from a workflow or process management perspective, and so perhaps Kerika needs to do something about it: we need to think about how we can help our users improve their workflow, while also avoiding these CPU spikes.

A couple of ideas that we are considering:

  • Start warning users when their boards are getting too big.
  • If boards hit some threshold values (which we have yet to figure out, maybe it’s 1,000 cards?) force the user to reconfigure their board so they don’t affect the quality of the service for everyone.

 

Exporting Kanban and Scrum Boards: a new Kerika feature

We have a great new Export feature for all Task Boards (i.e. Kanban Boards) and Scrum Boards.

The Export feature is simple, elegant and powerful, and is available to all Project Leaders, Team Members and Visitors on the project team.

To access this feature, simply click on the Project Info button that’s shown at the top-right of each Kerika Board, and you will see the Project Info display (that we have talked about in an earlier blog post):

Export
Export

CSV format is useful if you want to want to take data from Kerika and put it into Excel or some other analysis tool;

HTML format is useful if you want to print material from Kerika, or insert it into Word, PowerPoint or similar tools.

With both CSV and HTML exports, hidden cards are not exported: this means that if you are currently choosing to hide some columns (by using the Workflow button), or hide some cards (by using the Tags filters), then the cards that you are not viewing right now will not be part of the export.

When you export a board in CSV format, you get the following data, for each visible card:

Example of CSV export
Example of CSV export

Column Name: e.g. Backlog, In Progress, Done, etc.

Card Name: e.g. “Create PR news release”.

Card Description: e.g. “We need to create a PR news release once our latest version is ready…” (Rich text will be converted to plain text, since CSV files can only deal with plain text.)

Status: e.g. Needs Review, Needs Rework, etc. (If the card doesn’t have a special status, “Normal” will be shown.)

Due Date: the date the card is due, if a date has been set.  (If the card doesn’t have a Due Date, “Not Scheduled” will appear.)

Assigned To: a list of names of the people the card is currently assigned to.  (If the card isn’t assigned to anyone, “Not Assigned” will appear.)

Exporting could take a while: the exported data are put into a file in your Google Drive or Box account — depending upon whether you are using Kerika+Google or Kerika+Box — and when the process completes, you get an email with a link to the file containing your data.

It’s a similar experience if you do a HTML export; however the format of the data is different, giving you an indented set of attributes for each card, like this example from a Kerika+Box project:

Example of HTML export
Example of HTML export from Kerika+Box

One caveat about exporting HTML: if you open the results in Google Docs, Google shows a preview of the output, and that doesn’t look good: instead of rendering the HTML, Google actually exposes it.

Here’s an example from a Kerika+Google project:

HTML preview in Google Docs
Example of HTML export from Kerika+Google

The export feature can be used for many different purposes, of course: the most common scenario we envision is people wanting to include material from Kerika in their analysis and presentations.

And, of course, one use would be for government agencies that have to respond to Freedom of Information Act (FOIA) requests, or other Sunshine laws.

Project Info summary of your Kerika Board: a new Kerika feature

We are thrilled to announce a new feature in Kerika: a very useful Project Info display that summarizes of your project.

You can access this by clicking on the new Info button that appears in your Kerika toolbar, at the top-right corner of your board view:

Project Info display
Project Info display

This view is available to everyone who is part of the project team:  Project Leaders, Team Members and Visitors.

There are several sections in here: at the top is the Name and Description of the project:

Name and Description
Name and Description

The Description is a new attribute of Kerika’s boards: it lets you provide context about the project that can help orient new team members, and it can also help with your Searches in the future.

The Name and Description of a project can be modified at any time by Project Leader or Account Owner.

Next up is the Summary of the project:

Summary
Summary

The summary varies by the type of board (Whiteboards, Task Boards or Scrum Boards), but it provides useful information in all cases:

  • It tells you when the board was first created, and by whom.
  • It tells you when the board was last updated, and by whom.
  • And for Task Boards and Scrum Boards it tells you how many cards are done, and how many remain.

Since each card typically represents a work item, this is a quick way to find out how much work remains on a board, without having to count up all the cards in each column.

For Task Boards and Scrum Boards, this view also shows you how many cards are due today, due tomorrow, and overdue.

And for Scrum Boards, it shows you how many cards are in the Backlog that you are using, so you get a sense for how far along you are with the overall project, not just the current Sprint.

All Kerika Task Boards and Scrum Boards now have support for Work-In-Progress Limits: these can be turned on or off by the Project Leader or Account Owner:

Settings
Settings

Another huge new change: we are making it super easy to switch a board from being a Kanban Board to a Scrum Board, and back again.

Task Boards and Scrum Boards also have a new auto-numbering feature that can help you manage very large boards, e.g. if you are using Kerika for an internal Help Desk.

For both Tasks Boards and Scrum Boards, there is now a great new Export feature that lets you export cards from a board in CSV or HTML formats:

Export
Export

And, finally, you now have the option to make individual projects open to the public to view (but not change): a handy feature for open-source and volunteer-based projects like WIKISPEED:

Privacy
Privacy

Managing really large (and really old) Kanban Boards

Kerika’s Task Boards are so easy to set up and use that teams sometimes make the mistake of sticking everything on the same board, week after week and month after month, until the board becomes really too big to be useful.

The Kerika software itself doesn’t buckle under the weight of hundreds of cards on a single board (and, to be honest, we are also guilty of sometimes doing very large Scrum iterations that turned over a few hundred cards  -.-), but just because the software works fine doesn’t mean the practice makes sense.

The most common way for a Kanban board to get overcrowded is for it to be used for too long: the Done column gets bigger and bigger, as more work gets completed each week, until you end up with a very lop-sided looking board with perhaps 20-50 items in “To Do”,  and maybe 1,000 items in “Done”.

When presented with a board that contains hundreds or even thousands of items in Done, it’s hard for individual team members to get visual satisfaction from seeing cards move over to the Done column on a regular basis: as work gets done, it seems to vanish into this endless pile of other work that’s already been done.

Teams and, especially, Project Leaders should not underestimate the value of this visual satisfaction of seeing a well-balanced board, with about the same number of items in “To Do” (or Backlog, or Pending, or whatever you choose to call your parking lot) and in the “Done” column, with an even-looking distribution of items in the columns in the middle.

(The simplest Kanban board may just have three columns: To Do, Doing, and Done, but Kerika makes it easy to have far more complex workflows, and to capture your organizations’ best practices as a collection of process templates.)

If a Kanban board is going to be used for an extended period, say several months or more, then we recommend create a parallel History Board that can be used to track the historical achievements and progress of the team. Here’s how this scheme works:

  • Create a board called “History Board 2014”. (The name isn’t particularly important.)
  • Organize this boards with columns that look like this: Jan 2014, Feb 2014, Mar 2014…
An example of a History Board
An example of a History Board

We will use these columns to hold all the cards that were completed in that particular month. So, for example, the Jan 2014 column would contain everything that was completed in January 2014.

  • At the end of every month, pause for a moment to celebrate your team’s accomplishments for that month. (Order in some beer and pizza and maybe pause for longer than a moment…)
  • Move all the items that in Done onto the History Board: use Kerika’s cut-and-paste feature, which will let you move a bunch of cards intact, along with their history, chat, attachments, etc., from the Done column of your main Kanban board to the appropriate column in your History Board.

Laptop users will find their right-mouse click menu handy for this: click on a card in the Done column, do “Select All” from the right-mouse menu, and then do a “Cut”. Once you have cut (or copied) anything into your Kerika Clipboard, a Paste button will automatically appear at the top of each column, on each board where you can make changes.

So, Cut from Done on your active board, go over to your History Board, and then do click on the Paste button at the top of the appropriate column, e.g. the August 2014 column.

This simple method lets you achieve two objectives at the same time:

  • It’s an easy way to trim the size of your active Kanban board: by taking out the “Done” stuff each month you can stop it from ballooning in size over time.
  • It’s an easy way to create a comprehensive historical view of everything your team has achieved over time: go over to the History Board and you can see how work got done over an entire year. (Might be useful at performance review time ;-)

A side-benefit: your active Kanban board will load a lot faster if it doesn’t get overloaded.

 

 

Using Kerika with Git

We often get asked if Kerika has an integration with Git.  The short answer is “No”, but the longer answer is more nuanced…

We use Git ourselves for managing our own source code and other software assets.

Git was designed from the git go (ha!) to be used by distributed teams, having originated with the Linux kernel team, perhaps the most important distributed team in the whole world, so it made perfect sense for us to use it: it works across operating systems, and a number of simple GUIs are now available for managing your various source-code branches.

We simply embed the git references within cards on our project boards: sometimes in the chat conversation attached to a card, but more often within the card’s details.

Here’s an actual example of a bug that we fixed recently:

Example of Git integration
Example of Git integration

We use multiple Git branches at the same time, because we put every individual feature into a separate branch.

That’s not a fixed rule within Git itself; it’s just our own team’s practice, since it makes it easier for us to stick with a 2-week Sprint cycle: at the end of every 2 weeks we can see which features are complete, and pull these git branches together to build a new release.

So while Kerika doesn’t have a direct integration with Git, it’s pretty easy to use Kerika alongside Git, or other source management systems.

 

How we work with 2-week Sprints

Here at Kerika, we often get asked how we do Scrum as a distributed team.

Here’s the model we have evolved, which works for us mainly because we are the very essence of a distributed Agile team: we have people working together on the same product from locations that are 10,000 miles apart!

And this means that we are the most enthusiastic consumers of our products: we use Kerika to manage every part of our business and we only build what we would ourselves love to use.

Here’s the basic outline of our Scrum model:

Kerika's model for 2-week Sprints
Kerika’s model for 2-week Sprints

Each Sprint is 2 weeks long: that that works well for us; other folks might find that 3 weeks or 4 weeks i better. Pick what works for you.

Each Sprint begins with Sprint Planning, where the Scrum Team gets together with the Product Owner to decide which cards will be pull from our main Product Backlog into the Sprint Backlog.

Each Sprint is organized as a separate Scrum Board: this makes it really easy for us to concentrate upon needs to get delivered in that particular Sprint, without getting distracted by what was done in the past or what remains to be done.

And Kerika makes it really easy to pull cards (literally!) from the Backlog onto a Scrum Board, and then hide the Backlog from view so it doesn’t distract the Team while the Sprint is underway.

Half-way the Sprint, at the end of the first week, we do a gut-check: does the Sprint look like it is going reasonably well? We don’t ask if it is going perfectly: almost no Sprint does; what we are looking for is any indication that the Sprint is going to severely under-deliver in terms of the Team’s commitments to the Product Owner.

We could do these gut-checks every day during our Daily Standups, but in the first part of a Sprint cycle these can often give us false positives: it’s easy to tell early on if a Sprint is going to be disastrous, but it’s hard to tell for sure that it is actually going to end well. But about midway through the Sprint we start to have a more reliable sense for how things may turn out.

In keeping with the Scrum model, our goal is to complete a potentially shippable set of features and bug fixes with each Sprint, although this doesn’t necessarily mean that we will always ship what gets built after each Sprint. (More on that later.)

For each feature or bug, however large or small, we make sure that we have design and testing baked into the process:

  • The document is often just a few paragraphs long, because we always take cards representing large features (or other big work items) and break them up into smaller cards, so that no card is likely to take more than a day’s work. Kerika makes it really easy to link cards together, so it’s easy to trace work across multiple cards.
  • For bugs, the attached document describes the expected behavior, the actual behavior, and the root cause analysis.  Very frequently, screenshots showing the bugs are attached to the cards.
  • For new features, several documents may be attached, all quite small: there may be a high-level analysis document and a separate low-level design document.
  • For all features and bugs, we do test planning at the time we take on the work: for back-end (server) work we rely primarily on JUnit for writing automated tests; for front-end (UI) work we have found that automated testing is not very cost-effective, and instead rely more on manual testing. The key is to be as “test-driven” in our development as possible.

There are several benefits from doing formal planning, which some folks seem to view as being antithetical to an Agile model:

  • It helps find holes in the original requirements or UI design: good technical analysis finds all the edge cases that are overlooked when a new feature is being conceptualized.
  • It helps ensure that requirements are properly interpreted by the Team: the back-and-forth of analysis and reviewing the requirement helps ensure that the Product Owner and the Team are in synch on what needs to get done, which is especially important for new features, of course, but can also be important to understand the severity and priority of bugs.
  • It deliberately slows down the development pace to the “true” pace, by ensuring that time and effort for testing, especially the development of automated tests, is properly accounted for. Without this, it’s easy for a team to quickly hack new features, which is great at first but leads to unmaintainable and unstable code very soon.

At the end of the 2-week cycle, the Team prepares to end the Sprint…

We like to talk about Sprints as “buses”: a bus comes by on a regular schedule, and if you are ready and waiting at the bus stop, you can get on the bus.

But if you are not ready when the bus comes along, you are going to have to wait for the next bus, which thankfully does come by on a regular 2-week schedule.

This metaphor helps the Team understand that Sprints are time-boxed, not feature-boxed: in other words, at the end of every 2 weeks a Sprint will end, regardless of whether a feature is complete or not.  If the feature is complete, it catches the bus; otherwise it will have to wait for the next bus.

And here’s where the Kerika team differs from many other Scrum teams, particularly those that don’t consume their own products:

  • At the end of each Sprint, we do the normal Sprint Retrospective and Show & Tell for the Product Owner.
  • But, we also then take the output of the Sprint and deploy it to our test environment.
  • Our test environment is the one we actually use on a daily basis: we don’t use the production environment as often, preferring to risk all of our work by taking the latest/greatest version of the software on the test environment.

This forces us to use our newest software for real: for actual business use, which is a much higher bar to pass than any ordinary testing or QA, because actual business use places a higher premium on usability than regular QA can achieve.

(And, in fact, there have been instances where we have built features that passed testing, but were rejected by the team as unusable and never released.)

Kerika's model for 2-week Sprints
Click on this image to see the actual Kerika Whiteboard

This is illustrated above: the version of Kerika that’s built in Sprint 1 is used by the team to work on Sprint 2.

This is where the rubber meets the road: the Kerika Team has to build Sprint 2, while using what was built in the previous Sprint. If it isn’t good enough, it gets rejected.

At the end of Sprint 2, we will release the output of Sprint 1 to production. By this time it will have been used in a real sense by the Kerika Team for at least 2 weeks, post regular QA, and we will have a high confidence that the new features and bug fixes are solid and truly usable.

We could summarize our model by saying that our production releases effectively lag our Sprint output by one Sprint, which gives us the change to “eat our own dogfood” before we offer it to anyone else.

You can see the actual Whiteboard project for this process flow here.

 

 

Using status indicators on Task Boards and Scrum Boards: Done!

(The sixth, and last, in a series of blog posts on how you can make use of the status indicators on cards, in Task Boards and Scrum Boards.)

In our last post we talked about how to use the “Is blocked” flag; today, let’s take a look at “Done”.

Setting status
Setting status

“Done” is where you want to get to: it’s a special column that’s always to the right edge of every Task Board and Scrum Board.

(You can always chose to hide the Done column, of course, just like you can hide every other column on the board.)

Marking a card as “Done” is simply a quick way of moving it to the Done column, which can be handy when you have a very elaborate workflow — and we have seen folks whose boards have up to 20 columns!

In the near future when we add Work-In-Progress (WIP) Limits for Task Boards and Scrum Boards, the Done column, of course, will not be subject to WIP.

We are also planning on adding more metrics to help Project Leaders and Account Owners understand how well their projects are going, and these will naturally make use of the Done count.

All posts in this series: